Developer: Saint Petersburg Mining University
Industry
Energy, Energy Conservation, Energy Efficiency
Project Scientific Team
Head: Yuri Leonidovich Zhukovsky Scientific team:
Scientific novelty
The novelty lies in the use of storage batteries to reduce the number of switching operations of diesel generator sets in a multi-unit diesel power plant operating in conjunction with renewable energy installations, as well as an intelligent algorithm for assessing the feasibility of connecting these storage batteries based on fuzzy logic methods. A fuzzy algorithm for assessing the feasibility of connecting storage batteries is proposed, using multi-factor short-term forecasting of electrical load power and power generated by renewable energy installations.
Advantages
Reduction of diesel fuel consumption by increasing the capacity factor of renewable energy installations and reducing the warm-up time of diesel generator sets before startup; extending the service life of diesel generator sets in multi-unit diesel power plants by reducing the number of starts followed by short-term operation; extending the service life of diesel generator sets in multi-unit diesel power plants by reducing the number of operating hours at low load.
Commercial implementation
Designed or operated autonomous power complexes, including multi-unit diesel power plants and installations based on renewable energy sources. Autonomous power complexes, including multi-unit diesel power plants, with the potential for using renewable energy sources.
Development stage
Industrial prototype development
Required investment
5,000,000.00 RUB
Investor's share in the project
0%
Protection documents
Participation in exhibition and fair events
Silver medal and 2nd degree diploma of the XXXVIII International Innovation Exhibition "HI TECH 2022". Silver medal and 2nd degree diploma of the XXVI Moscow International Salon of Inventions and Innovative Technologies "Archimedes - 2023".
Investments
Database of innovative projects of the Mining University